Solar PV grants and incentives for apartment buildings and residential complexes

For solar PV on the shared parts of a building, each owner deducts their share of the cost over ten years: for costs paid in 2026, 50% if they own the flat and live in it, 36% in all other cases. The building can also become a group of self-consumers and receive a GSE tariff on the energy it shares. The system is charged VAT at 10%.

Updated on official sources checked

Try:
  • 5

    incentives open today

  • 31 December 2026

    next deadline: Tax deduction for solar PV on an apartment building's common parts

  • 50%

    deduction on 2026 costs, for an owner whose main home is in the building (36% in all other cases)

  • 6 of 6

    entries checked against official sources

Each row takes you to its section. Greyed-out entries are being checked: we show what is missing and no figures.

Status
Type

6 incentives shown

Summary table of the incentives: incentive, who can claim it, how much it is worth, closing date, status
IncentiveWho can claim itHow muchClosesStatus
Tax deduction for solar PV on an apartment building's common parts (renovation bonus)Every apartment owner who pays income tax, in proportion to their share2026 costs: 50% main home, 36% in other cases, up to 96,000 euros per unit, over ten years31 December 2026Open
Group of self-consumers in an apartment building (collective self-consumption)Apartment owners and the apartment building, with connection points in the same buildingGSE tariff on the shared energy + ARERA valorisation payment on the energy self-consumed (amounts in the CER entry)31 December 2027Open
GSE premium tariff for shared energy (energy communities and distributed self-consumption)Distributed self-consumption configurations: CERs, groups of self-consumers, remote self-consumersPremium tariff for 20 years on shared energy: a fixed part of 60 to 80 euros/MWh depending on size, plus a variable part of up to 40 euros/MWh31 December 2027Open
Recovery plan non-repayable grant for CERs and groups of self-consumers in municipalities under 50,000 residentsCERs and groups of self-consumers with systems in municipalities under 50,000 residents (applications closed)Up to 40% of the eligible costs (applications closed on 30 November 2025)30 November 2025Closed
10% VAT on building solar PV systemsAnyone having a solar PV system built, apartment buildings includedVAT at 10% instead of 22% on the system, finished components and contracted worksNo deadline set.Open
GSE Ritiro Dedicato (and the end of Scambio sul Posto)Producers with solar PV systems of any capacityThe hourly market price for your zone for every kWh fed in, with a guaranteed minimum price for smaller systemsno closing dateOpen

The incentives in detail

Open an entry for requirements, steps, documents and mistakes to avoid. Every entry carries its official sources at the end.

OpenTax relief

Tax deduction for solar PV on an apartment building's common parts (renovation bonus)

If the apartment building installs solar PV on the common parts, each owner deducts their share of the cost from income tax in ten annual instalments. For costs paid in 2026 the deduction is 50% on the share of anyone who owns (or holds a right in rem over) a main home in the building, and 36% in all other cases, up to 96,000 euros of spending per property unit.Worth: 2026 costs: 50% main home, 36% in other cases, up to 96,000 euros per unit, over ten yearsCloses: 31 December 2026
Show the details

The last day to pay at the 2026 rates (50% and 36%). The deduction continues in 2027 at lower rates (36% and 30%), under the rules in force as at 19 November 2026.

Who can claim it

  • Each individual owner, in proportion to their share in thousandths (or the other apportionment criteria in the Civil Code, articles 1123 and following).
  • Owners, bare owners and holders of a right in rem of enjoyment (usufruct, use, habitation, surface rights).
  • Tenants and borrowers with a registered contract and the owner's consent, cohabiting family members and de facto partners who bear the cost: they are entitled to the deduction, but not to the higher rate.
  • Owners of only a garage or cellar in the building.
  • The sole owner of a whole building with at least two separately registered units: the rules on common parts apply to them too.
Who is excluded
  • Anyone who pays no income tax: this is a deduction from personal income tax.
  • Buildings used for production, retail or offices.
  • The higher rate is not available to tenants, borrowers and cohabiting family members: the lower rate applies to them.

How much it is worth

  • Costs paid in 2025 and 2026: 50% on the share of an owner (or holder of a right in rem) of a unit used as their main home; 36% in all other cases. Spending limit: 96,000 euros per property unit.
  • Costs paid in 2027, under the rules in force as at 19 November 2026: 36% for a main home and 30% in other cases, again up to 96,000 euros.
  • Costs paid from 2028 to 2033: 30% for all homes, up to 48,000 euros.
  • The deduction is split into ten equal annual instalments, starting from the year in which the building manager pays by bank transfer.
  • For the common parts the higher rate applies to the individual owner's share of the cost. What counts is who holds title to the property when the works begin and whether the property is a main home when the works end.
  • The spending limit for the common parts is separate from works in your own flat: the two sets of works have separate limits.
  • If your total income exceeds 75,000 euros, there is a ceiling on all your deductions taken together (article 16-ter of the consolidated income tax act): the annual instalment is what counts.

Eligible costs

  • Installing a solar PV system on the common parts (flat roof, pitched roof, other common surfaces): it falls among the energy-saving works based on renewable sources.
  • A storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.) connected to the installation, installed with the system or later.

Requirements for solar PV

  • The system must serve the home's energy needs (domestic uses, lighting, electrical appliances), that is, be placed directly at the service of the home.
  • The deduction is ruled out if selling the surplus energy becomes a commercial activity. The Agenzia delle Entrate gives as examples a system with a capacity above 20 kW and one of up to 20 kW not serving the home.
  • For solar PV and storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) the report on the works must be sent to ENEA within 90 days of the end of the works or of commissioning, at bonusfiscali.enea.it. If it is missing or late, the deduction is not lost.

Combining it with other incentives

  • It can be combined with Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) (selling the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) the energy fed into the grid), if the system serves the home.
  • It cannot be combined with the ecobonus (the deduction for energy upgrading) for the same costs: choose one of the two.
  • With the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s premium tariff for shared energy (groups of self-consumers and CERs): the GSE states that it can be combined, with no reduction, with the deductions «at ordinary rates» under article 16-bis, paragraph 1, letter h), of the consolidated income tax act. The tariff cannot be combined with the Superbonus.

How to apply

  1. 1Resolution of the owners' meeting. The owners' meeting approves the system and how the costs are shared. Keep the minutes and the table of shares: they are needed for the deduction.
  2. 2Payment by qualifying bank transfer. The manager pays the firm with the renovation bank transfer (a qualifying transfer: it states the deduction it relates to, the building's tax code and the manager's, and the firm's VAT number or tax code). The bank withholds 11% from the firm.
  3. 3Pay your share. Pay the building your share by the deadline for filing your tax return: the deduction is available only on the share paid.
  4. 4The manager's report. By 16 March of the following year, the manager reports the year's spending on the common parts to the Agenzia delle Entrate, through Entratel or Fisconline. That way the figures reach the pre-filled tax return.
  5. 5Report to ENEA. Within 90 days of the end of the works or of commissioning, the details of the solar PV system and of any storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) must be sent to ENEA.
  6. 6Deduction in your tax return. You enter your share in your tax return (form 730 or Redditi) and deduct one instalment a year for ten years.

Documents

  • A certificate from the manager attesting that the obligations have been met and stating the amount you can deduct: it replaces the rest of the documentation.
  • Minutes of the owners' meeting approving the works and the table of shares for apportioning the costs.
  • The receipt of the report to ENEA.
  • In small buildings with no manager and no tax code: invoices and bank transfers; if you file your return through a tax assistance centre or an intermediary, also a self-declaration with the works carried out and the land-registry details of the units.

Mistakes that cost you the benefit

  • Paying the firm with an ordinary bank transfer or one filled in incompletely. If the bank cannot apply the withholding, the deduction is lost, unless the transfer is repeated or the firm provides a substitute declaration.
  • Not paying your share to the building by the tax return deadline.
  • Counting on 50% if you are a tenant, a borrower or a cohabiting family member, or if the property is not a main home when the works end: in those cases 36% applies (2026 costs).
  • Claiming the renovation bonus and the ecobonus on the same costs.
  • Taking it for granted that the 2026 rates apply in 2027 too: what counts is the date of the manager's bank transfer.

Example: on an investment of 100,000 euros

The building spends 100,000 euros on a solar PV system on the common parts and the manager pays in 2026. Your flat is worth 100 thousandths, so your share is 10,000 euros.

On an investment of 100,000 euros
Your share of the cost (100 thousandths)10,000 euros
Deduction at 50% (you own it and live there)5,000 euros, that is 500 euros a year for ten years
Deduction at 36% (for example, a let flat)3,600 euros, that is 360 euros a year for ten years

Official sources

  • Agenzia delle Entrate — Guida «Ristrutturazioni edilizie: le agevolazioni fiscali», aggiornamento febbraio 2026, capitolo 1
  • Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, comma 22, lettera b)
  • Normattiva — Decreto-legge 4 giugno 2013, n. 63, art. 16, comma 1, testo vigente dal 1° gennaio al 31 dicembre 2026
  • Normattiva — Decreto legislativo 19 giugno 2026, n. 117 (nuovo testo unico delle imposte sui redditi), art. 373, comma 1, vigente dal 1° gennaio 2027
  • Agenzia delle Entrate — Comunicazione degli amministratori di condominio, scheda «Che cos'è», aggiornata all'11 febbraio 2026
  • Agenzia delle Entrate — «Tutte le agevolazioni della dichiarazione 2026 – Recupero patrimonio edilizio», limiti di detraibilità e risparmio energetico

Checked on 19 November 2026

OpenFeed-in tariff

Group of self-consumers in an apartment building (collective self-consumption)

An apartment building can become a group of self-consumers (owners sharing the energy of a renewable system in the same building). The GSE pays a premium tariff on the shared energy and a valorisation payment on the energy self-consumed. The application is filed with the GSE by 31 December 2027, or earlier if the 5 GW quota runs out.Worth: GSE tariff on the shared energy + ARERA valorisation payment on the energy self-consumed (amounts in the CER entry)Closes: 31 December 2027
Show the details

Or until the thirtieth day after 5 GW of incentivised capacity is reached, if that comes first.

Who can claim it

  • At least two separate parties (final customers and/or producers) and at least two separate connection points: one with a consumption point and one with the generating system.
  • Any holder of a connection point (POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.)) in the same building or apartment building.
  • The system may be owned by a third party or run by a third-party producer, provided it follows the group's instructions.
Who is excluded
  • Businesses whose main activity falls under ATECO 35.1, 35.11.00, 35.12.00 or 35.15.00.
  • Businesses for which taking part in the group is their main commercial or industrial activity.
  • Consumers outside the building or apartment building: for them the route is a renewable energy community (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) (CER).

How much it is worth

  • A premium tariff (an operating incentive) on the shared energy eligible for support, for systems up to 1 MW. The amounts are the same as for energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.): you will find them in the entry on the CER tariff.
  • A valorisation payment set by ARERA, which refunds certain components of the bill on the energy self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.).
  • The energy fed into the grid can be sold on the market or to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) through Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
  • If the systems are in a municipality with fewer than 50,000 residents, the group can also receive the recovery plan capital grant: see the dedicated entry.
  • The part of the tariff above the shared-energy threshold set by the decree goes only to consumers other than businesses or to social purposes in the local area.

Eligible costs

  • It does not refund a cost: the tariff is calculated on the shared energy. Duration and amounts are in the entry on the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) tariff.

Requirements for solar PV

  • A new system, or an upgrade of an existing one, that entered service on or after 16 December 2021.
  • A maximum capacity of 1 MW to receive the tariff; above that, only the valorisation payment.
  • Newly built modules and components (for solar PV, refurbished components are not allowed).
  • The system may stand in the building or at another site at the full disposal of one or more members of the group, under the same primary substation.
  • Storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.) are allowed.
  • Compliance with the DNSH principle (Do No Significant Harm to the environment) as set out in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s rules.

Combining it with other incentives

  • It can be combined, with no reduction of the tariff, with the tax deductions «at ordinary rates» for solar PV (article 16-bis, paragraph 1, letter h, of the consolidated income tax act).
  • It can be combined with the recovery plan grant under the CACER decree, but the tariff is reduced in line with the grant obtained.
  • It can be combined with other capital grants up to 40%, with a reduction of the tariff.
  • It cannot be combined with the Superbonus, with other operating incentives or with capital grants above 40% of the eligible costs.

How to apply

  1. 1Resolution and contract. The owners taking part sign a private contract. In an apartment building the minutes of the owners' meeting signed by the participants may be enough, with the minimum content set out in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Operating Rules.
  2. 2Appointing the referent. The referent handles the application and the contract with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.). It may be the building manager, appointed in the minutes of the owners' meeting; alternatively one of the owners under a mandate, the building's legal representative or an ESCO certified to UNI 11352.
  3. 3What the contract must say. Each member stays free to choose their own energy supplier and to leave at any time. The contract states who allocates the shared energy and who handles payments and receipts.
  4. 4Application to the GSE. The referent files the application for access to the distributed self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) service with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.).

Documents

  • A private contract between the members, or minutes of the owners' meeting signed by the participants.
  • The mandate to the referent, or minutes of the owners' meeting appointing the manager as referent.

Mistakes that cost you the benefit

  • Including consumption points outside the building: in a group the withdrawal points must be in the same building or apartment building.
  • Using refurbished solar PV components.
  • Counting on the Superbonus together with the tariff: they cannot be combined.
  • Putting off the application: the tariff must be applied for by 31 December 2027 or until the 5 GW run out.

Official sources

  • GSE — Pagina «Gruppi di autoconsumatori» (requisiti, referente, contratto, contributi)
  • GSE — Pagina «Configurazioni per l'autoconsumo diffuso»: DM MASE 7 dicembre 2023, n. 414 (decreto CACER), impianti ammessi e termini
  • GSE — Pagina «Corrispettivi e tariffa», sezione Cumulabilità
  • GSE — Regole operative CACER e TIAD, versione del 16 luglio 2025, paragrafo 1.2.3
  • Normattiva — Decreto legislativo 8 novembre 2021, n. 199, art. 30

Checked on 19 November 2026

OpenFeed-in tariff

GSE premium tariff for shared energy (energy communities and distributed self-consumption)

If your solar PV system is part of a renewable energy community (CER), of a group of self-consumers, or is a remote self-consumer, the GSE pays a premium tariff on the shared energy for 20 years. You can apply until 31 December 2027, or earlier if 5 GW of incentivised capacity is reached.Worth: Premium tariff for 20 years on shared energy: a fixed part of 60 to 80 euros/MWh depending on size, plus a variable part of up to 40 euros/MWhCloses: 31 December 2027
Show the details

It can be applied for up to the thirtieth day after 5 GW of incentivised capacity is reached, and in any case no later than 31 December 2027. The application must be filed within 120 days of the system entering service.

Who can claim it

  • Renewable energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) (CER): members or shareholders can be individuals, small and medium-sized businesses (SMEs), associations, third-sector bodies, religious bodies, research bodies and local authorities.
  • SMEs can take part in a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) only if that participation is not their main commercial or industrial activity.
  • Groups of self-consumers (for example in an apartment building or in a building with a single owner).
  • Remote self-consumers (a single customer using the energy from their own system sited elsewhere, under the same primary substation).
  • The application is filed by the configuration's Referent (the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) itself, the apartment building through its manager, the self-consumer) or, under a mandate, by a member of the configuration or by an ESCO certified to UNI 11352.
Who is excluded
  • Large businesses cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
  • Central government bodies cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
  • Private businesses whose main ATECO code is 35.1, 35.11.00, 35.12.00 or 35.15.00 cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
  • Businesses in difficulty and businesses with an outstanding State aid recovery order.
  • Systems with capacity above 1 MW: they only receive the valorisation payment on self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) energy, not the premium tariff.
  • The share of capacity installed to meet the renewables obligation in new or renovated buildings (the so-called mandatory capacity) does not receive the premium tariff.

How much it is worth

  • The premium tariff has a fixed part that depends on the system's capacity and a variable part that rises when the zonal energy price (the wholesale market price in your zone) falls below 180 euros/MWh.
  • Systems up to 200 kW: 80 euros/MWh plus the variable part, capped at 120 euros/MWh.
  • Systems above 200 kW and up to 600 kW: 70 euros/MWh plus the variable part, capped at 110 euros/MWh.
  • Systems above 600 kW: 60 euros/MWh plus the variable part, capped at 100 euros/MWh.
  • For solar PV there is a geographical uplift: +4 euros/MWh in the central Regions (Lazio, Marche, Toscana, Umbria, Abruzzo) and +10 euros/MWh in the northern Regions (Emilia-Romagna, Friuli-Venezia Giulia, Liguria, Lombardia, Piemonte, Trentino-Alto Adige, Valle d'Aosta, Veneto).
  • The tariff runs for 20 years from the date the system enters commercial operation and stays unchanged throughout.
  • On top of the premium tariff, the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays the valorisation payment set by ARERA on self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) energy (the refund of certain components of the bill).
  • The energy fed into the grid stays yours: you can sell it on the market or transfer it to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) under Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
  • If you also receive a capital grant (up to 40%), the tariff is reduced in proportion: by up to half where the grant is 40%.
  • The reduction for a capital grant does not apply to energy shared from the delivery points of local authorities, religious bodies, third-sector and environmental protection bodies and individuals.

Requirements for solar PV

  • Each system (or extension) must have a capacity no greater than 1 MW.
  • The systems and the consumers in the configuration must be connected under the same primary substation (the local electricity substation: check it on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s interactive map).
  • The system must be new or an extension of an existing one; for extensions the tariff applies only to the new section.
  • The system must have entered service on or after 16 December 2021 and, for CERs, after the community was duly set up.
  • For solar PV all the components must be newly built.
  • You must comply with the DNSH principle (Do No Significant Harm to the environment) under the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Operating Rules.
  • The systems must be at the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s disposal and under its control, even where a third-party producer makes them available.
  • The part of the tariff above the shared-energy threshold (55%, or 45% where there is also a capital grant) must go to consumers other than businesses or to social purposes in the local area: this must be written into the statutes or into an agreement.

Combining it with other incentives

  • Can be combined with the recovery plan grant under the CACER decree: the tariff is reduced in line with the grant obtained.
  • Can be combined with other capital grants up to 40% of the eligible investment costs: the tariff is reduced.
  • Can be combined with other State aid that is not a capital grant, if its value does not exceed 40% of the reference investment cost: the tariff is reduced.
  • Can be combined with no reduction with grants for pre-feasibility studies alone and for the costs of setting up the configuration.
  • Can be combined with no reduction with the ordinary tax deductions for homes (article 16-bis, paragraph 1, letter h, of the consolidated income tax act).
  • Can be combined with no reduction with other forms of public support other than capital grants that are not State aid.
  • Cannot be combined with other operating incentives (paid on the energy), with the Superbonus, or with capital grants or other State aid above 40% of the eligible costs.
  • An alternative to Scambio sul Posto.

How to apply

  1. 1Set up the configuration. A CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) needs a legal entity with compliant statutes (at least two members and two separate connection points). A group of self-consumers needs the building or the apartment building. Check on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) map that all the points are under the same primary substation.
  2. 2If you wish, ask for a preliminary check. It is optional and costs 100 euros. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) replies within 60 days with an opinion or with the requirements to follow.
  3. 3Bring the system into service. For CERs the system must enter service after the community has been set up.
  4. 4File the application with the GSE within 120 days. The Referent files it online only, through the SPC-Comunità Energetiche e Autoconsumo portal in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area, with the documents in Annex 3 of the Operating Rules. If you are late, you lose the tariff for the period between entering service and the application.
  5. 5Wait for the outcome. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) completes its assessment by the last day of the third month after the application. It then pays monthly amounts on account and a balancing payment the following year.

Documents

  • The CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s statutes or deed of incorporation with the elements the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) requires.
  • The mandate to the Referent, where the referent is not the configuration itself.
  • Documentation of the systems and the configuration listed in Annex 3 of the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Operating Rules.
  • DNSH check sheets.

Mistakes that cost you the benefit

  • Filing the application more than 120 days after entering service: you lose the tariff for the months of delay.
  • Bringing the system into service before the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) has been set up.
  • Connecting systems and consumers to different primary substations.
  • Including a large business in the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.), or an SME whose main activity is energy.
  • Forgetting the clause in the statutes on allocating the excess tariff to consumers other than businesses or to social purposes.

Official sources

  • GSE — Configurazioni per l'autoconsumo diffuso – Corrispettivi e tariffa, sezioni tariffa premio e cumulabilità
  • GSE — Configurazioni per l'autoconsumo diffuso – impianti ammessi e termine di richiesta
  • GSE — Comunità energetiche rinnovabili – chi può far parte di una CER, statuto
  • GSE — Come accedere – richiesta sul portale SPC e verifica preliminare
  • GSE – testo del decreto — DM MASE 7 dicembre 2023, n. 414, artt. 1, 3, 4, 5, 6 e Allegato 1
  • MASE — DM MASE 16 maggio 2025, n. 127, art. 1, comma 1, lettera f) (Allegato 1, paragrafo 3)

Checked on 19 November 2026

ClosedNon-repayable grant

Recovery plan non-repayable grant for CERs and groups of self-consumers in municipalities under 50,000 residents

This was a non-repayable grant of up to 40% of the costs of renewable energy systems forming part of an energy community (CER) or a group of self-consumers, in municipalities under 50,000 residents. Applications closed on 30 November 2025: you can no longer file new ones.Worth: Up to 40% of the eligible costs (applications closed on 30 November 2025)Closes: 30 November 2025
Show the details

The last window was open from 21 July to 30 November 2025. Systems admitted must enter service within 24 months of the award agreement and in any case no later than 31 December 2027.

Who can claim it

  • Renewable energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) (CER).
  • Groups of renewable energy self-consumers acting collectively.
  • The system had to be in a municipality with a population below 50,000 (ISTAT figures at the date of the application). Until 2025 the limit was 5,000 residents.
Who is excluded
  • Remote self-consumers: they can have the premium tariff but not this grant.
  • Systems in municipalities with 50,000 residents or more.
  • Systems whose works started before the grant application.
  • Systems with a capacity above 1 MW.

How much it is worth

  • A capital grant of at most 40% of the eligible costs, within the maximum reference costs set by the CACER decree.
  • Professional costs (pre-feasibility studies, design, works supervision, commissioning and consultancy) can be funded up to 10% of the eligible amount at most.
  • VAT is not eligible, except where it cannot be recovered.
  • Whoever receives the grant also has the premium tariff on the shared energy, but reduced in proportion to the grant.
  • Current funds managed by the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.): 1,041.5 million euros (795.5 million from decree-law no. 19 of 19 February 2026, plus 246 million from law no. 152 of 7 August 2026).
  • As at 30 November 2025, 1,456 million euros had been applied for, more than the funds available. Eligible but unfunded projects are waiting for any reallocation and can in any case have the premium tariff for 20 years.

Eligible costs

  • Building the renewable energy system (components, inverters, mounting structures, electrical components).
  • Supply and installation of storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.).
  • Machinery, plant and hardware and software equipment, with installation and commissioning.
  • Strictly necessary building works.
  • Connection to the national electricity grid.
  • Pre-feasibility studies and the costs of setting up the configuration, design, works supervision and safety, commissioning and consultancy: together at most 10% of the eligible amount.

Requirements for solar PV

  • A new system, or an upgrade of an existing one, with a capacity no greater than 1 MW.
  • A system in the area of the primary substation of the configuration it will be part of.
  • A permit for construction and operation and a connection quotation definitively accepted, where required.
  • Compliance with the DNSH principle (Do No Significant Harm to the environment) and with climate tagging.
  • Once built, the system must be part of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) or a group of self-consumers with an active contract for the premium tariff.
  • Entry into service within 24 months of notification of the award agreement and in any case no later than 31 December 2027.

Combining it with other incentives

  • It can be combined with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s premium tariff on shared energy, which is however reduced: by up to half with a grant of 40%.
  • For energy shared by local authorities, religious bodies, third-sector and environmental protection bodies and individuals, the reduction of the tariff does not apply.
  • The ban on double funding of the same costs that applies to recovery plan funds holds here too.

How to apply

  1. 1Applications closed. No new applications can be filed since 30 November 2025. Anyone who already has an award agreement with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) follows the steps below.
  2. 2Report the start of the works. Within 30 days of the works starting, the beneficiary reports the date on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) portal.
  3. 3Claim payment. Up to 200 kW you can claim an advance of up to 30% and then the balance, or the whole balance. Above 200 kW and up to 1 MW there is also the option of an intermediate instalment of 40%.
  4. 4Report the costs. Follow the Facility CACER Operating Rules and the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s instructions for reporting.

Documents

  • The award agreement with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.).
  • The permit and the accepted connection quotation, where required.
  • Proof of costs under the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s reporting instructions.

Mistakes that cost you the benefit

  • Starting the works before filing the application.
  • Failing to bring the system into service by 31 December 2027.
  • Not signing the contract for the premium tariff: the grant can be withdrawn.
  • Not reporting the start of the works within 30 days.

Official sources

  • GSE — Comunità energetiche rinnovabili e gruppi di autoconsumatori in Comuni fino a 50.000 abitanti – chi può partecipare, come richiedere, spese, risorse
  • GSE — Configurazioni per l'autoconsumo diffuso – termine del 30 novembre 2025 per il contributo PNRR
  • MASE — DM MASE 16 maggio 2025, n. 127, art. 1 (modifiche agli artt. 1, 7, 8, 10 e all'Allegato 1 del DM 414/2023)
  • MASE — Notizia del 17 luglio 2025: sportello dal 21 luglio al 30 novembre 2025
  • GSE – testo del decreto — DM MASE 7 dicembre 2023, n. 414, art. 6, Allegato 1 par. 3, Allegato 2

Checked on 19 November 2026

OpenTax relief

10% VAT on building solar PV systems

Building a solar PV system is charged VAT at 10% instead of 22%. It applies to the system, to the finished components used to build it and to works awarded under a contract. It does not apply to storage added to a system already in operation.Worth: VAT at 10% instead of 22% on the system, finished components and contracted worksCloses: No deadline set.
Show the details

Who can claim it

  • The rule defines the relief by reference to the system (systems generating electricity from solar PV), without limiting it to a category of customers.
Who is excluded
  • Raw materials and semi-finished goods.
  • Simple improvements or changes to an existing system, even where they increase its capacity.
  • A storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.) added to a solar PV system already in operation: for the Agenzia delle Entrate this is not an extension of the system and it is charged VAT at the ordinary rate.

How much it is worth

  • Systems generating electricity from solar PV: VAT at 10% (presidential decree 633/1972, table A, part III, item 127-quinquies).
  • Finished goods supplied to build the system, raw materials and semi-finished goods excluded: VAT at 10% (item 127-sexies).
  • Services under works contracts for building the system: VAT at 10% (item 127-septies).
  • Extending a system counts as partial new construction, so it falls under the 10% VAT.
  • From 1 January 2027 the new consolidated VAT act applies (legislative decree no. 10 of 19 January 2026): the legal references are renumbered.

Eligible costs

  • Supply of the solar PV system.
  • Finished components (goods whose production process is complete) bought to be used directly in building the system.
  • Works to build or extend the system carried out under a works contract.

Requirements for solar PV

  • The goods must be components needed to build the system: it is not enough for them to be useful or connected to it.
  • It must be new construction or an extension, not a simple change to an existing system.

Combining it with other incentives

  • It is a reduced rate applied on the invoice: it is not a grant and is not applied for from any authority.

How to apply

  1. 1Check the quotation. Check that the quotation for the system and for the contracted works applies VAT at 10%.
  2. 2Watch out for storage. If you add a battery to a system already in operation, expect VAT at 22%.

Documents

  • The firm's invoice showing the rate applied.

Mistakes that cost you the benefit

  • Thinking the 10% VAT applies to any work on the system: a simple change, or storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) added later, is charged VAT at the ordinary rate.
  • Buying raw materials or semi-finished goods yourself: they are excluded.

Example: on an investment of 100,000 euros

A new solar PV system with contracted works for 100,000 euros plus VAT.

On an investment of 100,000 euros
VAT at 10%10,000 euros
VAT at 22% (ordinary rate)22,000 euros
Difference12,000 euros

Official sources

  • Agenzia delle Entrate — Risposta a interpello n. 181/2026 (aliquota IVA per sistema di accumulo su impianto fotovoltaico già operante), con il testo dei numeri 127-quinquies, 127-sexies e 127-septies della tabella A, parte III, DPR 633/1972
  • Agenzia delle Entrate — Guida «Ristrutturazioni edilizie», febbraio 2026, capitolo 2 (aliquota ordinaria del 22%)
  • Normattiva — Decreto legislativo 19 gennaio 2026, n. 10 (testo unico IVA), art. 171: si applica dal 1° gennaio 2027

Checked on 19 November 2026

OpenFeed-in tariff

GSE Ritiro Dedicato (and the end of Scambio sul Posto)

With Ritiro Dedicato you sell the GSE the energy your system feeds into the grid and does not consume, at market prices, without going to the exchange. For systems that entered service after 29 May 2025 it is the simple way to get value from the energy fed in, because Scambio sul Posto is no longer available.Worth: The hourly market price for your zone for every kWh fed in, with a guaranteed minimum price for smaller systemsCloses: The service is always available. The contract runs for a calendar year and renews itself; you can withdraw with at least 60 days' notice.
Show the details

Who can claim it

  • Systems powered by renewable sources with a nominal apparent capacity below 10 MVA.
  • Solar (photovoltaic), wind, geothermal, wave, tidal and run-of-river hydroelectric systems of any capacity.
  • Systems that are part of energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) or groups of self-consumers can also transfer the energy fed in through Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
Who is excluded
  • Systems receiving an all-inclusive tariff (incentive and sale of the energy together), for example solar PV supported under the fifth Conto Energia (decree of 5 July 2012).
  • Systems using Scambio sul Posto: the two services are not compatible.
  • Systems that entered service after 29 May 2025 can no longer access Scambio sul Posto: Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) (or selling on the market) remains for them.

How much it is worth

  • The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays you for every kWh fed into the grid at the hourly zonal price, that is the market price in your zone in the hour you feed it in.
  • If the renewable system receives no incentive and has a capacity of up to 1 MW, or if it is a supported solar PV system up to 100 kW, you can choose the guaranteed minimum price set each year by ARERA: in 2026 it is 4.75 euro cents per kWh for up to 1,500,000 kWh taken in a year.
  • With the guaranteed minimum price you receive a balancing payment the following year if the hourly zonal price has been higher: you always get the better of the two.
  • As a guide: in the first quarter of 2026 the average hourly zonal price paid to a renewable system was 12.8 euro cents per kWh, and 11.5 cents in 2025. These are averages: the real price changes every hour and by zone.
  • Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) revenue is added to that from other incentives, except all-inclusive tariffs.
  • The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays monthly, two months after the month concerned.

Requirements for solar PV

  • With the Modello Unico (the simplified procedure through the grid operator) the solar PV system must: have a capacity of up to 200 kW; be installed at a customer who already has an active low or medium voltage withdrawal point; stand on the roof of a building or on other above-ground structures; and request Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) together with the connection.
  • In all other cases the standard route is used, applying to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) within 60 days of entering service.

Combining it with other incentives

  • It can be combined with the premium tariff for energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) and distributed self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.): the energy fed in stays the producer's, who can transfer it to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) through Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
  • The revenue is added to that from other incentive schemes, except those with an all-inclusive tariff.
  • It is not compatible with Scambio sul Posto.

How to apply

  1. 1System up to 200 kW on a roof: Modello Unico. If you already have an active withdrawal point, ask for Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) together with the connection through the grid operator. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) starts the contract from the date the connection is activated.
  2. 2In other cases: apply within 60 days. Within 60 days of entering service, file the application from the Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) (RID) portal in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area, with the technical and administrative details.
  3. 3Choose the price. When applying you choose between the hourly zonal price and the guaranteed minimum price, if your system can have it.
  4. 4Invoice, if you are required to. If you have to issue an invoice, you issue it from the RID portal by the month after the month of production, otherwise payment is delayed.

Documents

  • The system's technical and administrative details, entered on the RID portal.
  • An up-to-date IBAN in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area.

Mistakes that cost you the benefit

  • Still counting on Scambio sul Posto for a new system: it is no longer available for systems that entered service after 29 May 2025.
  • Filing the standard application more than 60 days after entering service.
  • Not issuing the invoice from the RID portal in time: payment is delayed.
  • A wrong or out-of-date IBAN in the Customer Area.

Official sources

  • GSE — Ritiro dedicato – Cos'è e chi può accedere
  • GSE — Ritiro dedicato – Come accedere (Modello Unico e modalità standard)
  • GSE — Ritiro dedicato – Regolazione economica del servizio, prezzi 2026
  • GSE — News 6 marzo 2025 – Scambio sul posto, stop al meccanismo
  • ARERA — Delibera 4 marzo 2025, 78/2025/R/efr, in attuazione dell'art. 9, comma 2, del D.Lgs. 199/2021
  • GSE — Ritiro dedicato secondo l'Allegato A alla deliberazione ARERA 280/07 e s.m.i.

Checked on 19 November 2026

What this means for your building

To install a shared solar PV system on the common parts, you need a majority of those attending the meeting representing at least half the value of the building (500 thousandths). This comes from the Civil Code: a renewable energy system is an improvement under article 1120, second paragraph, and must be approved by the majority set in article 1136, second paragraph, at a second call too.

An individual flat owner may install a system for their own flat on the roof terrace, on another suitable shared surface or on their own private parts (article 1122-bis of the Civil Code). If work on the shared parts is needed, they must tell the building manager beforehand. The meeting, with a majority of those attending and at least two thirds of the value of the building, may require a different arrangement, safeguards for stability, safety and appearance, a guarantee against damage, and a sharing of the use of the roof terrace. Work that undermines the stability or the appearance of the building, or makes a shared part unusable even for a single owner, remains forbidden.

The deduction on the shared parts is not the same for everyone in the same building. For costs paid in 2026, an owner (or holder of a right in rem) whose main home is there deducts 50% of their share; a landlord, a tenant or a family member living there deducts 36%. The cap is 96,000 euros per property unit and is separate from the cap for work inside the flat.

The building manager has a central role: they pay the contractor by «bonifico parlante» (a bank transfer carrying the legal references), issue each owner a certificate of their deductible share, and report the year's costs to the Agenzia delle Entrate by 16 March of the following year.

If the energy from the system also serves the flats, the building can become a group of self-consumers. There is no need to set up a new legal entity: a contract or the minutes of the resolution signed by the participating owners is enough, and the building manager can act as the contact with the GSE. To involve homes and businesses outside the building you need a renewable energy community (CER) instead, which is a legal entity of its own.

The deduction and the GSE tariff can be added together: the GSE states that the tariff can be combined, with no reduction, with deductions «at ordinary rates» for solar PV. The Superbonus, on the other hand, rules the tariff out.

Frequently asked questions

How much can be deducted in 2026 for solar PV on an apartment building?

Each owner deducts their own share of the cost, split into ten yearly instalments. For costs paid by the building manager in 2026 the deduction is 50% if you are the owner (or hold a right in rem) and the flat is your main home when the work ends. In all other cases it is 36%. The spending cap is 96,000 euros per property unit.

What majority does the meeting need for solar PV on the building?

You need a majority of those attending representing at least half the value of the building, that is 500 thousandths. This is the majority in article 1136, second paragraph, of the Civil Code, required for the improvements in article 1120, second paragraph, which include renewable energy systems. It applies at a second call too.

Can I put panels on the shared roof just for my own flat?

Yes. Article 1122-bis of the Civil Code allows an individual owner to install a renewable energy system for their own unit on the roof terrace or on another suitable shared surface. If work on the shared parts is needed you must tell the building manager first. The meeting, with at least two thirds of the value of the building, may prescribe a different arrangement, safeguards, a guarantee against damage and how the space is shared.

Group of self-consumers or energy community: what is the difference?

In a group of self-consumers everyone is in the same building, and a contract or a resolution signed by the participants is enough. A renewable energy community (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) is a legal entity of its own instead: its members can be individuals, including within their own apartment building, small and medium-sized businesses and local authorities. For both, the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) tariff on shared energy must be applied for by 31 December 2027, or earlier if 5 GW of incentivised capacity is reached.

What changes from 2027 for the deduction?

Under the rules in force on 19 November 2026, for costs paid in 2027 the rates fall to 36% for a main home and 30% in all other cases, still up to 96,000 euros. From 1 January 2027 the rule sits in article 373 of the new consolidated income tax act. What counts is the date of the building manager's bank transfer. If the 2027 budget act changes these rates, we will update this page.

Can the deduction be added to the GSE tariff?

Yes: according to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.), the tariff for shared energy can be combined, with no reduction, with the deductions «at ordinary rates» in article 16-bis, paragraph 1, letter h, of the consolidated income tax act. The tariff cannot be combined with the Superbonus. The deduction can also be combined with Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).

Updates

  1. The new consolidated income tax act has been published in the Official Gazette (legislative decree 117 of 19 June 2026). From 1 January 2027 the renovation bonus sits in article 373, with the rates already set for 2027: 36% for a main home, 30% in all other cases.

  2. The Agenzia delle Entrate has updated its guidance on reporting costs for the shared parts: the building manager files it by 16 March each year.

  3. The new consolidated VAT act has been approved (legislative decree 10 of 19 January 2026): it applies from 1 January 2027 and renumbers the rules on 10% VAT for solar PV.

  4. The 2026 budget act (law 199 of 30 December 2025) extended to 2026 the 50% deduction for a main home and 36% in all other cases.

Related pages

Work out how much your building saves

Sofia sizes the system around your consumption, applies the incentives you are entitled to and puts you in touch with 2-3 installers. Free of charge.

The information on this page is guidance, current at the date shown and based on the official sources cited. It does not replace the opinion of an accountant or an adviser: before committing to an investment, check your own case with a professional.

Jump to…