Solar PV grants and incentives for agriculture
As at 19 November 2026 the two incentives created for solar PV in farming are closed: Parco Agrisolare (its last window ran from 10 March to 9 April 2026) and the national recovery plan incentives for agrivoltaics (selections in 2024 and 2025). Tax reliefs remain, but which one you can claim depends on how your business declares its income.
Updated on official sources checked
3
incentives open today
31 December 2027
next deadline: GSE premium tariff for shared energy
80%
top grant under the last Parco Agrisolare (Table 1A, self-consumption), window closed on 9 April 2026
6 of 7
entries checked against official sources
All the incentives at a glance
Each row takes you to its section. Greyed-out entries are being checked: we show what is missing and no figures.
7 incentives shown
| Incentive | Who can claim it | How much | Closes | Status |
|---|---|---|---|---|
| Parco Agrisolare and Facility Parco Agrisolare (recovery plan) | Farmers, agri-industrial businesses, agricultural cooperatives and their groupings | Up to 80% of the eligible costs, on maximum spending of 2,260,000 euros per business | 9 April 2026 | Closed |
| Recovery plan incentives for advanced agrivoltaics (ministerial decree no. 436 of 22 December 2023) | Farmers, their groupings and temporary business associations including at least one farmer | A grant of up to 40% of the eligible costs plus a tariff on the energy fed into the grid | no closing date | Closed |
| 4.0 tax credit for farming, fishing and aquaculture businesses (2026-2028) | Farming, fishing and aquaculture businesses that cannot use enhanced depreciation | 40% for investments up to 1 million euros | 28 September 2028 | Opening soon |
| Enhanced depreciation 2026-2028 (Nuovo Piano Transizione 5.0) | Businesses with business income | 180% of the cost up to 2.5 million euros | 30 September 2028 | Open |
| ZES unica tax credit for primary agricultural production | — | Being checked | — | Being checked |
| GSE premium tariff for shared energy (energy communities and distributed self-consumption) | Distributed self-consumption configurations: CERs, groups of self-consumers, remote self-consumers | Premium tariff for 20 years on shared energy: a fixed part of 60 to 80 euros/MWh depending on size, plus a variable part of up to 40 euros/MWh | 31 December 2027 | Open |
| GSE Ritiro Dedicato (and the end of Scambio sul Posto) | Producers with solar PV systems of any capacity | The hourly market price for your zone for every kWh fed in, with a guaranteed minimum price for smaller systems | no closing date | Open |
The incentives in detail
Open an entry for requirements, steps, documents and mistakes to avoid. Every entry carries its official sources at the end.
ClosedNon-repayable grantParco Agrisolare and Facility Parco Agrisolare (recovery plan)
A non-repayable recovery plan grant for solar PV on the roofs of farm, livestock and agri-industrial buildings. The last window, the Facility Parco Agrisolare, was open from 10 March to 9 April 2026 and is closed: as at 19 November 2026 there is no new call.Worth: Up to 80% of the eligible costs, on maximum spending of 2,260,000 euros per businessCloses: 9 April 2026Show the details
The window closed on 9 April 2026 at 12 noon. The lists of successful applicants have been published and are being updated; as at 19 November 2026 no new call appears.
Who can claim it
- Farmers, individually or as a company.
- Agri-industrial businesses.
- Agricultural cooperatives carrying on the activities in article 2135 of the Civil Code, and the cooperatives or their consortia provided for by legislative decree no. 228 of 18 May 2001.
- The same parties in grouped form: temporary business associations, temporary groupings, business networks, renewable energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) (CER).
- Which table you apply under depends on your main ATECO code (the code of your principal economic activity): primary agricultural production, processing into agricultural products, processing into non-agricultural products.
Who is excluded
- In the last call: businesses that started trading after 28 February 2025, unless they were set up in continuity with an earlier firm or company.
- A system, or part of one, mounted on a surface where asbestos cement or asbestos is present.
- Projects whose works started before the application.
How much it is worth
- Primary agricultural production with a self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) condition (Table 1A): a grant of 80% of the eligible costs. The energy produced must serve the farm's needs, or the shared needs if you apply as part of a grouping.
- Primary agricultural production without a self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) condition (Table 4A): a grant of 30% of the eligible costs, with uplifts: +20% for small businesses, +10% for medium-sized ones, +15% in the assisted areas under article 107(3)(a) of the EU Treaty.
- Processing agricultural products into agricultural products (Table 2A): 80% for systems from 6 to 200 kWp, 65% from 200 to 500 kWp, 50% from 500 to 1,000 kWp (kWp: the system's peak capacity).
- Processing agricultural products into non-agricultural products (Table 3A): a grant of 30% with the same uplifts as Table 4A.
- Maximum eligible spend per business: 2,260,000 euros, of which up to 1,500,000 euros for the solar PV system, up to 700,000 euros for ancillary work on the roof, up to 50,000 euros for storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) and up to 10,000 euros for charging points.
- Funds for the last window: 789 million euros; at least 40% of each table with priority for Abruzzo, Basilicata, Calabria, Campania, Molise, Puglia, Sardegna and Sicilia.
Eligible costs
- Buying and installing new solar panels on the roofs of production buildings and greenhouses, or a new section upgrading an existing system.
- Ancillary work on the same building: removing and disposing of asbestos from the roofs, thermal insulation of the roofs, a ventilation system.
- Storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.) (batteries) installed together with the system.
- Electric charging devices for sustainable mobility installed together with the system.
Requirements for solar PV
- A system capacity between 6 kWp and 1,000 kWp.
- A newly built system, with components never used in other installations.
- Modules from manufacturers listed in ENEA's Register of photovoltaic modules, category A, B or C; category B or C modules give priority and a higher spending limit.
- A roof free of asbestos cement or asbestos: where present, it must be removed through the ancillary work before the modules are laid.
- A building that is registered with the land registry, not derelict and used in the business's activity; you must have the use of it.
- Compliance with the DNSH principle (Do No Significant Harm to the environment) required by the recovery plan.
- Under Table 1A the energy produced must cover the farm's energy needs.
Combining it with other incentives
- It can be combined with other State aid and de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) aid on the same costs, if the maximum grant intensity is not exceeded.
- It can be combined with other public measures if they cover different costs, or different shares of the same asset, and if the cost incurred is not exceeded.
- Energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) can access the incentives while respecting the limits on combining the grant and the premium tariff.
How to apply
- 1Wait for a new call. Applications cannot be filed today. If the Ministry of Agriculture (MASAF) opens a new window, it publishes it on its own website and on that of the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) (the energy services operator).
- 2Do not start the works. In the last call the application could not come after the works had started: anyone who had already begun was excluded.
- 3Application on the GSE platform. The proposal was filed from the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area, within the window set by the call, on a first come, first served basis: the order of arrival counts, after the priority criteria.
- 4Start and end of the works. After the award: notice of the start of the works within 30 days of starting, notice of their completion within 60 days of the end. In the last call the works must be completed within 18 months of the award and in any case by 31 December 2028.
- 5Keep the system running. The works must be kept efficient and in operation for at least 5 years after the grant is paid in full.
Documents
- A signed sworn declaration, on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s template, with a copy of the identity document of the person signing.
- Electricity bills in the business's name for 12 consecutive months, to show its needs.
- The building's land-registry record and documents proving you have the use of it.
- A technical report and an output simulation (PVGIS report) for the system.
- For large businesses: a counterfactual scenario analysis (what you would do without the grant).
Mistakes that cost you the benefit
- A main ATECO code not on the list in the call, or a table chosen other than the one set for your code.
- Consumption declared higher than the bills show.
- A meter (POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.)) not in the name of the business applying for the grant.
- Missing bills or land-registry record.
- A building in a land-registry category that is not eligible, for example a derelict unit or a building under construction.
- Surfaces with asbestos not correctly identified: the application is rejected.
- Storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) or charging points not properly described in the project: the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) zeroes the related part of the grant.
Example: on eligible spending of 100,000 euros
Under the rules of the last call, a primary agricultural production business under Table 1A, with the energy going to its own needs, received a grant of 80% of the eligible costs.
| Eligible spend | 100,000 euros |
|---|---|
| Table 1A grant (80%) | 80,000 euros |
| Left to the business | 20,000 euros |
Official sources
- MASAF — Avviso pubblico n. 89518 del 24 febbraio 2026, Facility Parco Agrisolare (M2C1-I4), artt. 2-5
- MASAF — Decreto ministeriale n. 681806 del 17 dicembre 2025, artt. 2, 3 e 5
- MASAF — Pagina Investimento 4 - Facility Parco Agrisolare, novità del 4 novembre 2026
- GSE — Facility Parco Agrisolare: Cos'è, Bando, Chi può accedere, Elenchi
- GSE — Presentazione Facility Parco Agrisolare del 27 febbraio 2026: intensità per tabella, requisiti, esclusioni
Checked on 19 November 2026
ClosedNon-repayable grantRecovery plan incentives for advanced agrivoltaics (ministerial decree no. 436 of 22 December 2023)
For advanced agrivoltaic systems (modules raised above crops or pasture, with monitoring) the recovery plan provides a grant of up to 40% of the eligible costs plus a tariff on the energy fed into the grid. The selection procedures took place in 2024 and 2025: new applications cannot be filed today.Worth: A grant of up to 40% of the eligible costs plus a tariff on the energy fed into the gridCloses: The selection procedures took place in 2024 and 2025. For those in the rankings the GSE signed the award agreements by 30 June 2026; the system must enter service within 24 months of notification of the agreement.Show the details
Who can claim it
- Farmers (article 2135 of the Civil Code), individually or as a company including a cooperative, agricultural companies, consortia of farmers, agricultural cooperatives and their consortia.
- Temporary business associations (ATI) that include at least one farmer.
- Systems up to 1 MW belonging to farmers: access through a register. Systems of any capacity: access through an auction, open to temporary business associations too.
Who is excluded
- Businesses in difficulty under the European definition.
- Parties exempt from VAT accounting with an annual turnover below 7,000 euros.
- Systems whose works began before the application to take part (what counts is the first irreversible commitment, for example ordering the equipment).
How much it is worth
- A capital (non-repayable (A grant that does not have to be paid back.)) grant of at most 40% of the eligible costs.
- A premium tariff on the net electricity output fed into the grid.
- Under decree-law no. 19 of 19 February 2026 the measure became a 1,099 million euro subsidy programme run directly by the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) (the energy services operator).
Eligible costs
- Building the advanced agrivoltaic system: modules, inverters, mounting structures, tracking systems, electrical components.
- Supply and installation of storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.).
- Equipment for the monitoring required by the CREA-GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) guidelines, management software included.
- Connection to the national electricity grid and strictly necessary building works.
- Studies, design, works supervision, commissioning and consultancy, up to 10% of the eligible amount.
Requirements for solar PV
- Modules raised above the ground, tracking ones included, so as not to interrupt the cultivation or grazing beneath the system.
- Minimum height of the modules: 2.1 metres for crops (so farm machinery can pass); 1.3 metres for livestock and for fixed vertical modules.
- At least 70% of the system's total surface given over to agricultural activity.
- The system's electricity output at least equal to 60% of that of a standard solar PV system on the same site.
- A monitoring system following the CREA-GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) guidelines: impact on crops, water saving, agricultural productivity, continuity of the farm.
- Continuity of farming and grazing on the land, verified under the CREA-GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) guidelines.
- A new system, with new components; the permit and a definitively accepted connection quotation already in hand at the time of the application.
Combining it with other incentives
- It cannot be combined with other public incentives for the same project.
- It is an alternative to Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) and Scambio sul Posto.
How to apply
- 1No new applications. As at 19 November 2026 no new procedure appears on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) website: registers and auctions took place in 2024 and 2025.
- 2If you are already in the rankings. The rankings are published on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) website and are updated by reallocation. The GSE signs an award agreement with each beneficiary; from the day it is notified to you, you have at most 24 months to bring the system into service.
- 3Grant and tariff. The new 24-month deadline applies both to the capital grant and to the tariff on the energy fed into the grid.
Documents
- A permit for construction and operation, or a favourable environmental impact assessment decision where required.
- A definitively accepted grid connection quotation.
- A bank's statement on the applicant's financial capacity, or the bank's commitment to fund the work.
- Receipted invoices paid by bank transfer, attached to the notice of entry into service.
Mistakes that cost you the benefit
- Starting the works or ordering the equipment before the application: the system loses access to the incentives.
- Modules too low or agricultural surface below 70%: the system is not advanced agrivoltaics.
- Stopping cultivation or grazing beneath the system: agricultural continuity is an operating requirement.
- Building a system with a capacity below the one admitted in the ranking: this is a ground for withdrawal.
Example: on eligible costs of 100,000 euros
The capital grant reaches at most 40% of the eligible costs. On top of this comes the tariff on the energy fed into the grid, which depends on output and is not calculated here.
| Eligible costs | 100,000 euros |
|---|---|
| Maximum grant (40%) | 40,000 euros |
Official sources
- GSE — Sviluppo Agrivoltaico, pagina Cos'è (con richiamo all'art. 27 del DL 19 febbraio 2026, n. 19)
- GSE — Graduatorie delle procedure del DM 436/2023, aggiornate per scorrimento
- MASE — DM 22 dicembre 2023, n. 436, artt. 2, 4, 5, 13, Allegati 2 e 3
- MASE — DM 19 giugno 2025, n. 149, modifiche ai tempi di entrata in esercizio e rendicontazione
Checked on 19 November 2026
Opening soonTax relief4.0 tax credit for farming, fishing and aquaculture businesses (2026-2028)
The 2026 budget act provides for a 40% tax credit, for investments up to 1 million euros, for farming, fishing and aquaculture businesses buying 4.0 assets. It is not designed for solar PV: it covers only the assets in annexes IV and V. And to use it a decree from the Ministry of Agriculture is needed which, as at 19 November 2026, we did not find published.Worth: 40% for investments up to 1 million eurosCloses: 28 September 2028Show the details
Investments from 1 January 2026 to 28 September 2028. To apply, the implementing decree from the Ministry of Agriculture (paragraph 459) is needed: as at 19 November 2026 we did not find it on the official websites.
Who can claim it
- Businesses active in the primary production of agricultural products and in fishing and aquaculture.
- Only if they can use neither enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) nor the 2026 agricultural ZES credit: the law excludes investments made by anyone who can benefit from those measures.
Who is excluded
- Investments by anyone who can use enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) (paragraphs 427-436 of the 2026 budget act).
- Investments by anyone who can use the 2026 ZES unica credit for agriculture (paragraphs 462-465).
- Investments that already benefit from article 1, paragraph 446, of law 207/2024.
How much it is worth
- 40% of the cost for investments up to 1 million euros.
- Funds: 2.1 million euros for each of the years 2026, 2027 and 2028. The procedures for staying within the funds are set by the implementing decree.
- It can only be used by offsetting on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form, from the year after the one in which the cost was incurred.
- For businesses not required to have a statutory audit, the cost of the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) is added to the credit, up to 5,000 euros.
Eligible costs
- New tangible and intangible capital assets listed in annexes IV and V to the 2026 budget act (4.0 assets), bought between 1 January 2026 and 28 September 2028.
- Also on a finance lease: what counts is the cost paid by the leasing company.
Requirements for solar PV
- Annex IV does not name solar PV. The only entry that comes close concerns «smart systems and solutions for energy management», including the generation of energy used solely for the production process.
- Renewable energy systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) are, in the law, a separate category provided for only under enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.). A solar PV system on its own therefore does not appear to be covered by this credit: ask for confirmation before counting on it.
Combining it with other incentives
- It can be combined with other aid on the same costs, provided the total does not exceed the cost incurred.
- It cannot be combined with the 2026 ZES unica credit for agriculture, according to the Agenzia delle Entrate.
How to apply
- 1Wait for the implementing decree. The Ministry of Agriculture, together with the MIMIT and the Ministry of the Economy, must set the rules and award procedures by decree. Until then there is no form to file.
- 2Prepare correct invoices. Invoices, delivery notes and other purchase documents must expressly cite paragraphs 454 to 459 of law no. 199 of 30 December 2025.
- 3Have the costs certified. An accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) from a statutory auditor is required; if you are not subject to an audit, you ask for it from an auditor listed in section A of the register.
Documents
- Invoices and delivery notes citing paragraphs 454-459 of law 199/2025.
- Accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) from a statutory auditor.
- The lease contract, if the asset is on a finance lease.
Mistakes that cost you the benefit
- Invoices without the reference to paragraphs 454-459: you risk losing the credit.
- Counting on this credit for a solar PV system: the law does not list it.
- Using it when you can already have enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) or the agricultural ZES credit: in those cases it is excluded.
- Selling the asset or not exercising the lease by 31 December of the fifth year after completion: the credit is reduced.
Official sources
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 454-459 e Allegato IV
- Agenzia delle Entrate — Scheda ZES agricoltura 2026: non cumulabilità con il credito dei commi 454-459
Checked on 19 November 2026
OpenTax reliefEnhanced depreciation 2026-2028 (Nuovo Piano Transizione 5.0)
You can deduct from income tax more than you spent: the cost of a solar PV system for self-consumption is uplifted by 180% on the portion up to 2.5 million euros. It applies to systems completed between 1 January 2026 and 30 September 2028.Worth: 180% of the cost up to 2.5 million eurosCloses: 30 September 2028Show the details
System completed (work finished) by 30 September 2028; completion report by 15 November 2028.
Who can claim it
- Anyone with business income who invests in assets used in production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in Italy: resident businesses and permanent establishments of foreign businesses, whatever their legal form, sector or size.
- Farms: what counts is how you determine your income. The law refers to «persons with business income»; those who cannot use enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) have a dedicated agricultural tax credit (see the Agriculture page).
Who is excluded
- Businesses in voluntary liquidation, bankruptcy, compulsory administrative liquidation, composition with creditors without business continuity or any other insolvency procedure, even where it is only being declared.
- Businesses subject to disqualifying sanctions (legislative decree 231/2001).
- For those who qualify, the benefit applies only if they comply with workplace safety rules and pay their employees' social contributions correctly.
How much it is worth
- 180% on the portion of the investment up to 2.5 million euros.
- 100% on the portion above 2.5 and up to 10 million euros.
- 50% on the portion above 10 and up to 20 million euros.
- It is not a tax credit to be used on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form: it is an extra (off-book) deduction on depreciation charges (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) or lease instalments, which reduces the taxable base for income tax only.
- The benefit starts from the tax year in which you file the completion report with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.), if the system entered service in that same year and after the GSE checks have come back positive.
Eligible costs
- The electricity generating units (modules and system components).
- The transformers upstream of the grid connection point and the meters for the energy produced.
- The system's auxiliary services.
- The storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.) connected to the installation, up to a ceiling: 2 times the eligible value of the system up to 20 kW, 1.5 times up to 600 kW, 1.2 times up to 1,000 kW, 1 time above that.
- Each system has a maximum eligible cost, set by the decree by size and by module type (Annex 1): spending above that ceiling is not uplifted.
Requirements for solar PV
- The energy produced must serve the business's own consumption, including at a distance.
- The system may produce at most 105% of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s energy needs, calculated on the average annual consumption of the previous year. Those needs also include gas or other fuels used for heat, converted with the formulas in the decree.
- The system stands on the same land-registry parcels as the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.), or on different parcels if it is connected to the grid through an existing POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.) (the code of the delivery point) of the same facility.
- Modules: for solar, only systems with modules listed in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) of photovoltaic technologies, section b) or section c), qualify (article 12 of decree-law 181/2023). The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) platform only provides these two fields.
- Section b): modules with cells made in the European Union, with cell efficiency of at least 23.5%. Section c): modules made in the European Union with bifacial heterojunction or tandem cells made in the European Union, with cell efficiency of at least 24.0%.
Combining it with other incentives
- You can add it to other national or European incentives on the same costs, provided the support does not cover the same shares of the cost and the total does not exceed the cost incurred.
- The uplift is calculated on the cost net of other grants received for the same costs: for example, if a regional call covers part of the spend, the 180% applies only to the rest.
- It does not apply to investments using the deduction in article 1, paragraph 446, of law 207/2024.
- Text read in the original version of the law in the Official Gazette: later amendments (decree-law 38/2026) are being checked.
How to apply
- 1Get your consumption figures ready. Collect the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s electricity (and heat) consumption for the previous year and the POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.): they are needed to show that the system does not exceed 105% of the facility's needs.
- 2Advance report. On the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s «Nuovo Piano Transizione 5.0» portal (Customer Area, with SPID or CIE) you book the benefit: details of the business and of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.), the expected amount, the expected dates for finishing the work and entering service. The platform has been open since 12 June 2026.
- 3Confirmation report. Within 60 days of a positive outcome on the advance report you confirm the investment, with the date and amount of the payment that brings the down payment to at least 20% of the cost of each asset, and the invoice details. You cannot add assets and the costs can only go down.
- 4Completion report. Once the system is in service, and in any case by 15 November 2028, you file the completion report with the invoices and declare that you hold the sworn technical report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.) and the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.).
- 5Annual reports. From the first report and for as long as the benefit lasts: a periodic report by 20 January each year, and by 30 June the supplement with the depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) schedule.
Documents
- Annual electricity consumption (and any heat consumption) of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in the previous year.
- Invoices for the eligible costs and proof of payment of the down payment of at least 20%.
- A sworn technical report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.) by an engineer or industrial surveyor on the professional register, or a certificate from an accredited certification body.
- Accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) by a statutory auditor (including for businesses not required to have an audit).
- Registration of the modules in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) (section b or c).
- The lease contract and the purchase order, if the system is on a finance lease.
Mistakes that cost you the benefit
- Counting on the 180% for the part of the spend already covered by a grant: the uplift is calculated net of other grants on the same costs.
- Sizing the system above 105% of your needs: the excess part does not qualify.
- Ordering modules not listed in sections b) or c) of the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.).
- Missing a deadline (60 days for the confirmation, 10 days for supplements, 15 November 2028 for the completion): the benefit is lost.
- Thinking it is a credit to offset on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form: it is a deduction from income tax, and you need taxable profits.
- Selling the system or moving it abroad during the depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) period without replacing it with a similar asset: the benefit is forfeited.
- Not keeping the sworn report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.), the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.), the invoices and the delivery notes for inspections.
Example: on an investment of 100,000 euros
A solar PV system for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), completed in 2027, with an eligible cost of 100,000 euros. With the 180% uplift the business deducts 280,000 euros in all instead of 100,000, spread over the years of depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.). The real saving is the extra deduction multiplied by the income tax rate you pay: work it out with your accountant.
| Eligible cost | 100,000 euros |
|---|---|
| 180% uplift | +180,000 euros |
| Total deductible | 280,000 euros |
| On 3,000,000 euros | +4,500,000 (180% on 2.5 million) +500,000 (100% on 0.5 million) |
Official sources
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 427, 428, 429 e 431 (testo originario)
- MIMIT — Scheda «Nuovo Piano Transizione 5.0 - Iperammortamento», aggiornata al 15 ottobre 2026
- GSE — Nuovo Piano Transizione 5.0: chi può accedere, calcolo del beneficio, come accedere
- MIMIT-MEF — Decreto interministeriale 7 maggio 2026, artt. 3, 4, 6, 7, 8, 10 e Allegato 1
- GSE — Guida all'utilizzo della piattaforma NPTR5 (15 ottobre 2026), sezione impianti FER
- Normattiva — Decreto-legge 9 dicembre 2023, n. 181, art. 12, comma 1 (Registro ENEA dei moduli)
Checked on 19 November 2026
ZES unica tax credit for primary agricultural production
A tax credit for businesses in primary agricultural production that invest in capital assets in the assisted areas of southern Italy. For 2026 it applied to spending incurred from 1 January to 15 November 2026; we are checking whether it covers solar PV.
What is missing: We have not yet found on the official source how much the credit is worth for farms, nor whether, and on what conditions, it covers a solar PV system. For 2026 only spending incurred by 15 November 2026 qualified.
Source to check: NormattivaGazzetta UfficialeGazzetta Ufficiale
OpenFeed-in tariffGSE premium tariff for shared energy (energy communities and distributed self-consumption)
If your solar PV system is part of a renewable energy community (CER), of a group of self-consumers, or is a remote self-consumer, the GSE pays a premium tariff on the shared energy for 20 years. You can apply until 31 December 2027, or earlier if 5 GW of incentivised capacity is reached.Worth: Premium tariff for 20 years on shared energy: a fixed part of 60 to 80 euros/MWh depending on size, plus a variable part of up to 40 euros/MWhCloses: 31 December 2027Show the details
It can be applied for up to the thirtieth day after 5 GW of incentivised capacity is reached, and in any case no later than 31 December 2027. The application must be filed within 120 days of the system entering service.
Who can claim it
- Renewable energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) (CER): members or shareholders can be individuals, small and medium-sized businesses (SMEs), associations, third-sector bodies, religious bodies, research bodies and local authorities.
- SMEs can take part in a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) only if that participation is not their main commercial or industrial activity.
- Groups of self-consumers (for example in an apartment building or in a building with a single owner).
- Remote self-consumers (a single customer using the energy from their own system sited elsewhere, under the same primary substation).
- The application is filed by the configuration's Referent (the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) itself, the apartment building through its manager, the self-consumer) or, under a mandate, by a member of the configuration or by an ESCO certified to UNI 11352.
Who is excluded
- Large businesses cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
- Central government bodies cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
- Private businesses whose main ATECO code is 35.1, 35.11.00, 35.12.00 or 35.15.00 cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
- Businesses in difficulty and businesses with an outstanding State aid recovery order.
- Systems with capacity above 1 MW: they only receive the valorisation payment on self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) energy, not the premium tariff.
- The share of capacity installed to meet the renewables obligation in new or renovated buildings (the so-called mandatory capacity) does not receive the premium tariff.
How much it is worth
- The premium tariff has a fixed part that depends on the system's capacity and a variable part that rises when the zonal energy price (the wholesale market price in your zone) falls below 180 euros/MWh.
- Systems up to 200 kW: 80 euros/MWh plus the variable part, capped at 120 euros/MWh.
- Systems above 200 kW and up to 600 kW: 70 euros/MWh plus the variable part, capped at 110 euros/MWh.
- Systems above 600 kW: 60 euros/MWh plus the variable part, capped at 100 euros/MWh.
- For solar PV there is a geographical uplift: +4 euros/MWh in the central Regions (Lazio, Marche, Toscana, Umbria, Abruzzo) and +10 euros/MWh in the northern Regions (Emilia-Romagna, Friuli-Venezia Giulia, Liguria, Lombardia, Piemonte, Trentino-Alto Adige, Valle d'Aosta, Veneto).
- The tariff runs for 20 years from the date the system enters commercial operation and stays unchanged throughout.
- On top of the premium tariff, the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays the valorisation payment set by ARERA on self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) energy (the refund of certain components of the bill).
- The energy fed into the grid stays yours: you can sell it on the market or transfer it to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) under Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
- If you also receive a capital grant (up to 40%), the tariff is reduced in proportion: by up to half where the grant is 40%.
- The reduction for a capital grant does not apply to energy shared from the delivery points of local authorities, religious bodies, third-sector and environmental protection bodies and individuals.
Requirements for solar PV
- Each system (or extension) must have a capacity no greater than 1 MW.
- The systems and the consumers in the configuration must be connected under the same primary substation (the local electricity substation: check it on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s interactive map).
- The system must be new or an extension of an existing one; for extensions the tariff applies only to the new section.
- The system must have entered service on or after 16 December 2021 and, for CERs, after the community was duly set up.
- For solar PV all the components must be newly built.
- You must comply with the DNSH principle (Do No Significant Harm to the environment) under the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Operating Rules.
- The systems must be at the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s disposal and under its control, even where a third-party producer makes them available.
- The part of the tariff above the shared-energy threshold (55%, or 45% where there is also a capital grant) must go to consumers other than businesses or to social purposes in the local area: this must be written into the statutes or into an agreement.
Combining it with other incentives
- Can be combined with the recovery plan grant under the CACER decree: the tariff is reduced in line with the grant obtained.
- Can be combined with other capital grants up to 40% of the eligible investment costs: the tariff is reduced.
- Can be combined with other State aid that is not a capital grant, if its value does not exceed 40% of the reference investment cost: the tariff is reduced.
- Can be combined with no reduction with grants for pre-feasibility studies alone and for the costs of setting up the configuration.
- Can be combined with no reduction with the ordinary tax deductions for homes (article 16-bis, paragraph 1, letter h, of the consolidated income tax act).
- Can be combined with no reduction with other forms of public support other than capital grants that are not State aid.
- Cannot be combined with other operating incentives (paid on the energy), with the Superbonus, or with capital grants or other State aid above 40% of the eligible costs.
- An alternative to Scambio sul Posto.
How to apply
- 1Set up the configuration. A CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) needs a legal entity with compliant statutes (at least two members and two separate connection points). A group of self-consumers needs the building or the apartment building. Check on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) map that all the points are under the same primary substation.
- 2If you wish, ask for a preliminary check. It is optional and costs 100 euros. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) replies within 60 days with an opinion or with the requirements to follow.
- 3Bring the system into service. For CERs the system must enter service after the community has been set up.
- 4File the application with the GSE within 120 days. The Referent files it online only, through the SPC-Comunità Energetiche e Autoconsumo portal in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area, with the documents in Annex 3 of the Operating Rules. If you are late, you lose the tariff for the period between entering service and the application.
- 5Wait for the outcome. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) completes its assessment by the last day of the third month after the application. It then pays monthly amounts on account and a balancing payment the following year.
Documents
- The CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s statutes or deed of incorporation with the elements the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) requires.
- The mandate to the Referent, where the referent is not the configuration itself.
- Documentation of the systems and the configuration listed in Annex 3 of the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Operating Rules.
- DNSH check sheets.
Mistakes that cost you the benefit
- Filing the application more than 120 days after entering service: you lose the tariff for the months of delay.
- Bringing the system into service before the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) has been set up.
- Connecting systems and consumers to different primary substations.
- Including a large business in the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.), or an SME whose main activity is energy.
- Forgetting the clause in the statutes on allocating the excess tariff to consumers other than businesses or to social purposes.
Official sources
- GSE — Configurazioni per l'autoconsumo diffuso – Corrispettivi e tariffa, sezioni tariffa premio e cumulabilità
- GSE — Configurazioni per l'autoconsumo diffuso – impianti ammessi e termine di richiesta
- GSE — Comunità energetiche rinnovabili – chi può far parte di una CER, statuto
- GSE — Come accedere – richiesta sul portale SPC e verifica preliminare
- GSE – testo del decreto — DM MASE 7 dicembre 2023, n. 414, artt. 1, 3, 4, 5, 6 e Allegato 1
- MASE — DM MASE 16 maggio 2025, n. 127, art. 1, comma 1, lettera f) (Allegato 1, paragrafo 3)
Checked on 19 November 2026
OpenFeed-in tariffGSE Ritiro Dedicato (and the end of Scambio sul Posto)
With Ritiro Dedicato you sell the GSE the energy your system feeds into the grid and does not consume, at market prices, without going to the exchange. For systems that entered service after 29 May 2025 it is the simple way to get value from the energy fed in, because Scambio sul Posto is no longer available.Worth: The hourly market price for your zone for every kWh fed in, with a guaranteed minimum price for smaller systemsCloses: The service is always available. The contract runs for a calendar year and renews itself; you can withdraw with at least 60 days' notice.Show the details
Who can claim it
- Systems powered by renewable sources with a nominal apparent capacity below 10 MVA.
- Solar (photovoltaic), wind, geothermal, wave, tidal and run-of-river hydroelectric systems of any capacity.
- Systems that are part of energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) or groups of self-consumers can also transfer the energy fed in through Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
Who is excluded
- Systems receiving an all-inclusive tariff (incentive and sale of the energy together), for example solar PV supported under the fifth Conto Energia (decree of 5 July 2012).
- Systems using Scambio sul Posto: the two services are not compatible.
- Systems that entered service after 29 May 2025 can no longer access Scambio sul Posto: Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) (or selling on the market) remains for them.
How much it is worth
- The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays you for every kWh fed into the grid at the hourly zonal price, that is the market price in your zone in the hour you feed it in.
- If the renewable system receives no incentive and has a capacity of up to 1 MW, or if it is a supported solar PV system up to 100 kW, you can choose the guaranteed minimum price set each year by ARERA: in 2026 it is 4.75 euro cents per kWh for up to 1,500,000 kWh taken in a year.
- With the guaranteed minimum price you receive a balancing payment the following year if the hourly zonal price has been higher: you always get the better of the two.
- As a guide: in the first quarter of 2026 the average hourly zonal price paid to a renewable system was 12.8 euro cents per kWh, and 11.5 cents in 2025. These are averages: the real price changes every hour and by zone.
- Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) revenue is added to that from other incentives, except all-inclusive tariffs.
- The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays monthly, two months after the month concerned.
Requirements for solar PV
- With the Modello Unico (the simplified procedure through the grid operator) the solar PV system must: have a capacity of up to 200 kW; be installed at a customer who already has an active low or medium voltage withdrawal point; stand on the roof of a building or on other above-ground structures; and request Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) together with the connection.
- In all other cases the standard route is used, applying to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) within 60 days of entering service.
Combining it with other incentives
- It can be combined with the premium tariff for energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) and distributed self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.): the energy fed in stays the producer's, who can transfer it to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) through Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
- The revenue is added to that from other incentive schemes, except those with an all-inclusive tariff.
- It is not compatible with Scambio sul Posto.
How to apply
- 1System up to 200 kW on a roof: Modello Unico. If you already have an active withdrawal point, ask for Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) together with the connection through the grid operator. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) starts the contract from the date the connection is activated.
- 2In other cases: apply within 60 days. Within 60 days of entering service, file the application from the Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) (RID) portal in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area, with the technical and administrative details.
- 3Choose the price. When applying you choose between the hourly zonal price and the guaranteed minimum price, if your system can have it.
- 4Invoice, if you are required to. If you have to issue an invoice, you issue it from the RID portal by the month after the month of production, otherwise payment is delayed.
Documents
- The system's technical and administrative details, entered on the RID portal.
- An up-to-date IBAN in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area.
Mistakes that cost you the benefit
- Still counting on Scambio sul Posto for a new system: it is no longer available for systems that entered service after 29 May 2025.
- Filing the standard application more than 60 days after entering service.
- Not issuing the invoice from the RID portal in time: payment is delayed.
- A wrong or out-of-date IBAN in the Customer Area.
Official sources
- GSE — Ritiro dedicato – Cos'è e chi può accedere
- GSE — Ritiro dedicato – Come accedere (Modello Unico e modalità standard)
- GSE — Ritiro dedicato – Regolazione economica del servizio, prezzi 2026
- GSE — News 6 marzo 2025 – Scambio sul posto, stop al meccanismo
- ARERA — Delibera 4 marzo 2025, 78/2025/R/efr, in attuazione dell'art. 9, comma 2, del D.Lgs. 199/2021
- GSE — Ritiro dedicato secondo l'Allegato A alla deliberazione ARERA 280/07 e s.m.i.
Checked on 19 November 2026
What this means for your sector
For a farm the first question is the roof. Parco Agrisolare funded solar PV on the roofs of production buildings and greenhouses, not on the ground, and it also paid for removing asbestos, insulating and ventilating the same building. The window has been closed since 9 April 2026 and stayed open for one month: if your shed still has asbestos cement, it is worth having the design ready before any new call.
The tax incentives for other businesses do not automatically apply to you. The enhanced depreciation in the 2026 budget act goes to those with business income. For primary agricultural producers the same act provides a 40% tax credit for investments up to 1 million euros, but only for those who cannot use enhanced depreciation and only for the 4.0 assets listed in annexes IV and V. That rule does not mention energy-producing systems, which enhanced depreciation lists separately: ask your accountant before counting on it.
Ground-mounted solar PV on farmland has rules of its own. The recovery plan incentives went only to advanced agrivoltaics: modules raised at least 2.1 metres above the crops (1.3 metres for grazing), at least 70% of the surface still farmed, and a crop monitoring system. The selections closed in 2025 and those on the list have 24 months from the agreement with the GSE to start operating.
How much energy you use on the farm matters. Under the last Parco Agrisolare the highest grant, 80%, went to applicants who used the energy for the farm's own needs, proven with 12 consecutive months of bills in the business's name. For the energy you do not use and feed into the grid, see the Ritiro Dedicato entry on this page.
If you are in southern Italy, check the ZES unica tax credit dedicated to primary agricultural production. For 2026 it applied to costs incurred by 15 November 2026; those who invested must file the report with the Agenzia delle Entrate between 20 November and 2 December 2026. We are still checking whether it covers solar PV.
Frequently asked questions
Is Parco Agrisolare open?
No. The last window, the Parco Agrisolare Facility, was open from 10 March to 9 April 2026. On 4 November 2026 the Ministry of Agriculture pointed to the project lists on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) website. As at 19 November 2026 there is no new call: if one is published, you will find it on the Ministry of Agriculture and GSE websites.
Can I use enhanced depreciation for solar PV on my farm?
It depends on how you declare your income. The 2026 budget act grants enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) to those with business income. Primary agricultural producers who cannot use it have a tax credit of their own, which however covers the 4.0 assets in annexes IV and V and does not mention energy-producing systems. Check with your accountant.
Did Parco Agrisolare also pay for removing asbestos?
Yes, as complementary work alongside the system, on the same building. In the last call the eligible cost for complementary work (asbestos, insulation, ventilation) reached 700,000 euros. Modules could not be laid on surfaces where asbestos cement remained.
Can I put ground-mounted panels on my land with an incentive?
The recovery plan incentives covered advanced agrivoltaics only: modules raised off the ground, farming or grazing continuing under the system, and monitoring in line with the CREA-GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) guidelines. The selections took place in 2024 and 2025 and no new applications are accepted today.
Can farming incentives be added to others?
Parco Agrisolare can be combined with other aid on the same costs only without exceeding the maximum aid intensity, and with other public measures only on different costs. The agrivoltaic incentives, on the other hand, cannot be combined with other public incentives on the same project and are an alternative to Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
Updates
The Ministry of Agriculture points to the project lists for the Parco Agrisolare Facility (admitted, eligible but not admitted, withdrawals, not eligible), published on the GSE website and updated from time to time.
The Parco Agrisolare Facility window, open since 10 March 2026, closed at 12:00.
The Parco Agrisolare Facility call has been published: 789 million euros for solar PV on the roofs of farm, livestock and agri-industrial buildings.
With decree-law 19 the recovery plan measure for agrivoltaics becomes a programme run by the GSE: 24 months from the grant agreement to start operating.
The 2026 budget act introduces enhanced depreciation for those with business income and a tax credit for primary agricultural producers, and extends the ZES credit for agriculture to 2026.
Related pages
- Apartment buildings5 openupd. 19 November 2026
- Public bodies2 openupd. 19 November 2026
- Retail and hospitality7 openupd. 19 November 2026
- Manufacturing6 openupd. 19 November 2026
- Logistics and warehouses6 openupd. 19 November 2026
- Tax credit3 openupd. 19 November 2026
- Enhanced depreciation1 openupd. 19 November 2026
- Regional grants7 openupd. 19 November 2026
Work out what your farm gets back
Sofia sizes the system around your consumption, applies the incentives you are entitled to and puts you in touch with 2-3 installers. Free of charge.
The information on this page is guidance, current at the date shown and based on the official sources cited. It does not replace the opinion of an accountant or an adviser: before committing to an investment, check your own case with a professional.